129667786250459142_204Last night
the old republic power leveling, the CNR (601,299 valuation, assessment, quotes, news, the major trading) announcement said its subsidiary holding shares of newly-built CRH380BL-EMU receives notification of the Ministry of railways, restoring factory acceptance. It is understood that long shares this year's delivery plan-CRH380BL there are still 17 column in EMU has not been delivered, covering theWith the amount of about $ 6.7 billion yuan.
Last night, China North locomotive and related official said, will not affect 17 emus delivered during the year, annual management goal long shares will not be affected. After the Beijing-Shanghai high-speed railway opened, long shares of production CRH380BL EMU series hot box alarm, automatic reduction of false positives with a bow, traction loss
swtor power leveling, failure, these failuresMore caused by the subcontractors accessory is not eligible, at the operation site is difficult to quickly troubleshoot and effective rectification and reform.
To this end, China North locomotive and proposed to the Ministry to suspend delivery planning requirements of the motor car.
On August 12, the announcement made by the CNR, recalling 54 large-CRH380BL that has been put into operation the EMU, qualified for rectification and reform, and then returned. On November 14, the Ministry said, CNR CRH380BL EMU has carried out serious rectification and reform on recall, after verification, third-party assessment and expert review, confirmed that the rectification and reform passed since November 16 batches put into operation. Gold-line statement: Gold-line reproduced above, does not indicate that confirm the description for investor use only and does not constitute investment advice. InvestorsAction, at your own risk.
No comments:
Post a Comment